TumbleCatch

Your gateway to endless inspiration

Moon2Mars - Blog Posts

5 years ago

You’ve Heard “Houston, we’ve had a problem,” But Do You Know The Mission It’s From?

It’s the 50th anniversary of the Apollo 13 mission! NASA’s “successful failure,”Apollo 13 was to be the third lunar landing attempt, but the mission was aborted mid-flight after the rupture of a service module oxygen tank. The crew never landed on the moon, but due to the dedication and ingenuity of Mission Control, made it back to Earth safely. We’ve put some of the most important numbers of the Apollo 13 mission in perspective. Check it out!

image
image
image
image
image
image
image
image
image

Listen to the mission in real time, HERE. 

Follow NASA History on Twitter and Facebook for more interesting information about aerospace history!

Check out the stats of all the Apollo Missions in the free e-book Apollo by the Numbers, HERE.


Tags
5 years ago

To the Moon and Beyond: Why Our SLS Rocket Is Designed for Deep Space

It will take incredible power to send the first woman and the next man to the Moon’s South Pole by 2024.  That’s where America’s Space Launch System (SLS) rocket comes in to play.

To The Moon And Beyond: Why Our SLS Rocket Is Designed For Deep Space

Providing more payload mass, volume capability and energy to speed missions through deep space than any other rocket, our SLS rocket, along with our lunar Gateway and Orion spacecraft, creates the backbone for our deep space exploration and Artemis lunar mission goals.

Here’s why our SLS rocket is a deep space rocket like no other:

It’s a heavy lifter

To The Moon And Beyond: Why Our SLS Rocket Is Designed For Deep Space

The Artemis missions will send humans 280,000 miles away from Earth. That’s 1,000 times farther into space than the International Space Station. To accomplish that mega feat, you need a rocket that’s designed to lift — and lift heavy. With help from a dynamic core stage — the largest stage we have ever built — the 5.75-million-pound SLS rocket can propel itself off the Earth. This includes the 57,000 pounds of cargo that will go to the Moon. To accomplish this, SLS will produce 15% more thrust at launch and during ascent than the Saturn V did for the Apollo Program.

We have the power 

To The Moon And Beyond: Why Our SLS Rocket Is Designed For Deep Space

Where do our rocket’s lift and thrust capabilities come from? If you take a peek under our powerful rocket’s hood, so to speak, you’ll find a core stage with four RS-25 engines that produce more than 2 million pounds of thrust alongside two solid rocket boosters that each provide another 3.6 million pounds of thrust power. It’s a bold design. Together, they provide an incredible 8.8 million pounds of thrust to power the Artemis missions off the Earth. The engines and boosters are modified heritage hardware from the Space Shuttle Program, ensuring high performance and reliability to drive our deep space missions.

A rocket with style

To The Moon And Beyond: Why Our SLS Rocket Is Designed For Deep Space

While our rocket’s core stage design will remain basically the same for each of the Artemis missions, the SLS rocket’s upper stage evolves to open new possibilities for payloads and even robotic scientific missions to worlds farther away than the Moon like Mars, Saturn and Jupiter. For the first three Artemis missions, our SLS rocket uses an interim cryogenic propulsion stage with one RL10 engine to send Orion to the lunar south pole. For Artemis missions following the initial 2024 Moon landing, our SLS rocket will have an exploration upper stage with bigger fuel tanks and four RL10 engines so that Orion, up to four astronauts and larger cargoes can be sent to the Moon, too. Additional core stages and upper stages will support either crewed Artemis missions, science missions or cargo missions for a sustained presence in deep space.

It’s just the beginning

To The Moon And Beyond: Why Our SLS Rocket Is Designed For Deep Space

Crews at our Michoud Assembly Facility in New Orleans are in the final phases of assembling the core stage for Artemis I— and are already working on assembly for Artemis II.

Through the Artemis program, we aim not just to return humans to the Moon, but to create a sustainable presence there as well. While there, astronauts will learn to use the Moon’s natural resources and harness our newfound knowledge to prepare for the horizon goal: humans on Mars.

Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com


Tags
5 years ago

Planes, Trains and Barges: How We’re Moving Our Artemis 1 Rocket to the Launchpad

Our Space Launch System rocket is on the move this summer — literally. With the help of big and small businesses in all 50 states, various pieces of hardware are making their way to Louisiana for manufacturing, to Alabama for testing, and to Florida for final assembly. All of that work brings us closer to the launch of Artemis 1, SLS and Orion’s first mission to the Moon.

image

By land and by sea and everywhere in between, here’s why our powerful SLS rocket is truly America’s rocket:

Rollin’ on the River

image

The SLS rocket will feature the largest core stage we have ever built before. It’s so large, in fact, that we had to modify and refurbish our barge Pegasus to accommodate the massive load. Pegasus was originally designed to transport the giant external tanks of the space shuttles on the 900-mile journey from our rocket factory, Michoud Assembly Facility, in New Orleans to Kennedy Space Center in Florida. Now, our barge ferries test articles from Michoud along the river to Huntsville, Alabama, for testing at Marshall Space Flight Center. Just a week ago, the last of four structural test articles — the liquid oxygen tank — was loaded onto Pegasus to be delivered at Marshall for testing. Once testing is completed and the flight hardware is cleared for launch, Pegasus will again go to work — this time transporting the flight hardware along the Gulf Coast from New Orleans to Cape Canaveral.

Chuggin’ along

image

The massive, five-segment solid rocket boosters each weigh 1.6 million pounds. That’s the size of four blue whales! The only way to move the components for the powerful boosters on SLS from Promontory, Utah, to the Booster Fabrication Facility and Vehicle Assembly Building at Kennedy is by railway. That’s why you’ll find railway tracks leading from these assembly buildings and facilities to and from the launch pad, too. Altogether, we have about 38-mile industrial short track on Kennedy alone. Using a small fleet of specialized cars and hoppers and existing railways across the US, we can move the large, bulky equipment from the Southwest to Florida’s Space Coast. With all the motor segments complete in January, the last booster motor segment (pictured above) was moved to storage in Utah. Soon, trains will deliver all 10 segments to Kennedy to be stacked with the booster forward and aft skirts and prepared for flight.

It’s a bird, it’s a plane, no, it’s super Guppy!

image

A regular passenger airplane doesn’t have the capacity to carry the specialized hardware for SLS and our Orion spacecraft. Equipped with a unique hinged nose that can open more than 200 degrees, our Super Guppy airplane is specially designed to carry the hulking hardware, like the Orion stage adapter, to the Cape. That hinged nose means cargo is actually loaded from the front, not the back, of the airplane. The Orion stage adapter, delivered to Kennedy in 2018, joins to the rocket’s interim cryogenic propulsion stage, which will give our spacecraft the push it needs to go to the Moon on Artemis 1. It fit perfectly inside the Guppy’s cargo compartment, which is 25 feet tall and 25 feet wide and 111 feet long.

All roads lead to Kennedy

image

In the end, all roads lead to Kennedy, and the star of the transportation show is really the “crawler.” Rolling along at a delicate 1 MPH when it’s loaded with the mobile launcher, our two crawler-transporters are vital in bringing the fully assembled rocket to the launchpad for each Artemis mission. Each the size of a baseball field and powered by locomotive and large power generator engines, one crawler-transporter is able to carry 18 million pounds on the nine-mile journey to the launchpad. As of June 27, 2019, the mobile launcher atop crawler-transporter 2 made a successful final test roll to the launchpad, clearing the transporter and mobile launcher ready to carry SLS and Orion to the launchpad for Artemis 1.

Dream Team

image

It takes a lot of team work to launch Artemis 1. We are partnering with Boeing, Northrop Grumman and Aerojet Rocketdyne to produce the complex structures of the rocket. Every one of our centers and more than 1,200 companies across the United States support the development of the rocket that will launch Artemis 1 to the Moon and, ultimately, to Mars. From supplying key tools to accelerate the development of the core stage to aiding the transportation of the rocket closer to the launchpad, companies like Futuramic in Michigan and Major Tool & Machine in Indiana, are playing a vital role in returning American astronauts to the Moon. This time, to stay. To stay up to date with the latest SLS progress, click here.

Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.


Tags
5 years ago

How We’re Accelerating Our Missions to the Moon

image

Our Space Launch System isn’t your average rocket. It is the only rocket that can send our Orion spacecraft, astronauts and supplies to the Moon. To accomplish this mega-feat, it has to be the most powerful rocket ever built. SLS has already marked a series of milestones moving it closer to its first launch, Artemis.

Here are four highlights you need to know about — plus one more just on the horizon.

Counting Down

image

Earlier this month, Boeing technicians at our Michoud Assembly Facility in New Orleans successfully joined the top part to the core stage with the liquid hydrogen tank. The core stage will provide the most of the power to launch Artemis 1. Our 212-foot-tall core stage, the largest the we have ever built, has five major structural parts. With the addition of the liquid hydrogen tank to the forward join, four of the five parts have been bolted together. Technicians are finishing up the final part — the complex engine section — and plan to bolt it in place later this summer.  

Ready to Rumble

image

This August, to be exact. That’s when the engines for Artemis 1 will be added to the core stage. Earlier this year, all the engines for the first four SLS flights were updated with controllers, tested and officially cleared “go” for launch. We’ve saved time and money by modifying 16 RS-25 engines from the space shuttle and creating a more powerful version of the solid rocket boosters that launched the shuttle. In April, the last engine from the shuttle program finished up a four-year test series that included 32 tests at our Stennis Space Center near Bay St. Louis, Mississippi. These acceptance tests proved the engines could operate at a higher thrust level necessary for deep space travel and that new, modernized flight controllers —the “brains” of the engine — are ready to send astronauts to the Moon in 2024.

Getting a Boost

image

Our industry partners have completed the manufacture and checkout of 10 motor segments that will power two of the largest propellant boosters ever built. Just like the engines, these boosters are designed to be fast and powerful. Each booster burns six tons of propellant every second, generating a max thrust of 3.6 million pounds for two minutes of pure awesome. The boosters will finish assembly at our Kennedy Space Center in Florida and readied for the rocket’s first launch in 2020. In the meantime, we are well underway in completing the boosters for SLS and Orion’s second flight in 2022.

Come Together

image

Meanwhile, other parts of the rocket are finished and ready for the ride to the Moon. The final piece of the upper part of the rocket, the launch vehicle stage adapter, will soon head toward Kennedy Space Center in Florida. Two other pieces, including the interim cryogenic propulsion stage that will provide the power in space to send Orion on to the Moon, have already been delivered to Kennedy.

Looking to the Future

image

Our engineers evaluated thousands of designs before selecting the current SLS rocket design. Now, they are performing critical testing and using lessons learned from current assembly to ensure the initial and future designs are up to the tasks of launching exploration missions for years to come. This real-time evaluation means engineers and technicians are already cutting down on assembly time for future mission hardware, so that we and our partners can stay on target to return humans to the Moon by 2024 — to stay so we can travel on to Mars.

Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com.


Tags
5 years ago

Throwback Thursday: Frequently Asked Questions about Apollo

image

In celebration of the 50th anniversary of Apollo 11, we’ll be sharing answers to some frequently asked questions about the first time humans voyaged to the Moon. Answers have been compiled from archivists in the NASA History Office.

How many people worked on the Apollo program?

image

At the height of Apollo in 1965, about 409,900 people worked on some aspect of the program, but that number doesn’t capture it all.

It doesn’t represent the people who worked on mission concepts or spacecraft design, such as the engineers who did the wind tunnel testing of the Apollo Command Module and then moved on to other projects. The number also doesn’t represent the NASA astronauts, mission controllers, remote communications personnel, etc. who would have transferred to the Apollo program only after the end of Gemini program (1966-1967). There were still others who worked on the program only part-time or served on temporary committees. In the image above are three technicians studying an Apollo 14 Moon rock in the Lunar Receiving Laboratory at Johnson Space Center. From left to right, they are Linda Tyler, Nancy Trent and Sandra Richards.

How many people have walked on the Moon so far?

image

This artwork portrait done by spaceflight historian Ed Hengeveld depicts the 12 people who have walked on the Moon so far. In all, 24 people have flown to the Moon and three of them, John Young, Jim Lovell and Gene Cernan, have made the journey twice.  

But these numbers will increase.

Are the U.S. flags that were planted on the Moon still standing?

image

Every successful Apollo lunar landing mission left a flag on the Moon but we don’t know yet whether all are still standing. Some flags were set up very close to the Lunar Module and were in the blast radius of its ascent engine, so it’s possible that some of them could have been knocked down. Neil Armstrong and Buzz Aldrin both reported that the flag had been knocked down following their ascent. 

image

Our Lunar Reconnaissance Orbiter took photographs of all the Apollo lunar landing sites. In the case of the Apollo 17 site, you can see the shadow of the upright flag.

But why does it look like it’s waving?

image

The flags appear to “wave” or “flap” but actually they’re swinging. Swinging motions on Earth are dampened due to gravity and air resistance, but on the Moon any swinging motion can continue for much longer. Once the flags settled (and were clear of the ascent stage exhaust), they remained still.  And how is the flag hanging? Before launching, workers on the ground had attached a horizontal rod to the top of each flag for support, allowing it to be visible in pictures and television broadcasts to the American public. Armstrong and Aldrin did not fully extend the rod once they were on the Moon, giving the flag a ripple effect. The other astronauts liked the ripple effect so much that they also did not completely extend the rod. 

Why don’t we see stars in any of the pictures?

image

Have you ever taken a photo of the night sky with your phone or camera? You likely won’t see any stars because your camera’s settings are likely set to short exposure time which only lets it quickly take in the light off the bright objects closest to you. It’s the same reason you generally don’t see stars in spacewalk pictures from the International Space Station. There’s no use for longer exposure times to get an image like this one of Bruce McCandless in 1984 as seen from Space Shuttle Challenger (STS-41B).

The Hasselblad cameras that Apollo astronauts flew with were almost always set to short exposure times. And why didn’t the astronauts photograph the stars? Well, they were busy exploring the Moon!

When are we going back to the Moon?

image

The first giant leap was only the beginning. Work is under way to send the first woman and the next man to the Moon in five years. As we prepare to launch the next era of exploration, the new Artemis program is the first step in humanity’s presence on the Moon and beyond.

Keep checking back for more answers to Apollo FAQs.

Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com. 


Tags
5 years ago

We Just Took a Major Step Forward in our Moon Landing Program

As part of the Commercial Lunar Payload Services (CLPS) initiative, we’ve selected the first American companies that will deliver our science and technology payloads to the Moon.

image

Seen above from left to right are lander prototypes from:

Astrobotic of Pittsburgh, Pennsylvania

Intuitive Machines of Houston, Texas

Orbit Beyond of Edison, New Jersey

image

Astrobotic of Pittsburgh has proposed to fly as many as 14 payloads to a large crater on the near side of the Moon.

image

Intuitive Machines of Houston has proposed to fly as many as five payloads to a scientifically intriguing dark spot on the Moon.

image

Orbit Beyond of Edison, New Jersey, has proposed to fly as many as four payloads to a lava plain in one of the Moon’s craters.

Each company is charged with demonstrating technology that will shape the development of future landers and other exploration systems needed for humans to return to the Moon’s surface under the new Artemis program. Artemis is the program that will send the first woman and the next man to the Moon by 2024 and develop a sustainable human presence on the Moon by 2028. The program takes its name from the twin sister of Apollo and goddess of the Moon in Greek mythology.

image

Together we are going to the Moon—to stay.

Watch the CLPS announcement on our YouTube channel to learn about how each company will prepare us for human missions to the Moon: https://www.youtube.com/watch?v=qODDdqK9rL4

Make sure to follow us on Tumblr for your regular dose of space: http://nasa.tumblr.com. 


Tags
Loading...
End of content
No more pages to load
Explore Tumblr Blog
Search Through Tumblr Tags